- Knowledge Base
- MAS
- UTI and UTI Generation
Singapore: How should a reporting entity update the interim-UTI to the final-UTI?
When updating a previously reported derivatives contract with the final-UTI, a new report with the final UTI should be submitted for the derivatives contract. The interim-UTI should be indicated in the reportable field “prior UTI”.
NOTE: ther original report is ERORed out then a NEWT is submitted.