Onboarding: RS Testing - Connectivity Verification Test (CVT)
Purpose: Testing the connectivity between client systems and KOR.
What is Tested:
-
Submission of files in final production format for each data feed and internal system.
-
Verification of all systems expected to connect in production.
Timing:
-
Can be performed before, during, or after Scenario-Based UAT.
-
Ensures the final production connection method functions as expected.
Connection Method:
-
Must be the exact method intended for production go-live (e.g., API, SFTP).
What KOR Does
-
Reviews all Client submissions to confirm they are processed successfully and meet required standards.
-
Provides technical support, with KOR’s technology team available to address any issues or answer questions as needed.
What the Client Does
-
Submits data in the final production format, using the agreed production connection method.
-
Ensures all required data types are included in submissions, including transaction, static, valuation, and collateral data.
Estimated Duration:
-
Typically 1 to 10 days.
Can be done before, after, or in parallel with Scenario-Based UAT (User Acceptance Testing)