Onboarding: RS Testing - Capacity & Performance Test (CPT)

Purpose: Testing system capacity and performance under load.

What is Tested:

  • Ability to process the expected daily trade volume, multiplied by a predefined performance factor.

  • Confirmation that performance standards are met without degradation.

What KOR Does

  • Reviews the tests submitted by the Client.

  • Assists the Client in determining the appropriate volume of testing.

  • Identifies and implements any necessary system adjustments based on testing results.

What the Client Does

  • Submits the agreed testing volumes within the timelines provided by KOR.

Shared Environment Clients

  • Because the environment cannot be reset on demand without affecting other clients, all UTIs must be modified to ensure they do not match production-reported UTIs when backload testing begins.

Estimated Duration:

  • Typically 1 to 5 days.

Can be done before, after, or in parallel with Historical Data UAT